01
Smaller stack documentation
External inspection of institutional and small-industrial stacks within the envelope.
For smaller industrial facilities, institutional plants, district heating operations, university research facilities, and small-manufacturing operations.
Major industrial inspection firms are sized for refinery, power plant, and large industrial customers. Smaller facilities can pay more for mobilization than for the actual inspection.
For smaller assets in the working envelope, Arcaed is a cost-effective option. Institutional chimneys, boiler vent stacks, district heating assets, and similar smaller structures are often a better fit.
01
External inspection of institutional and small-industrial stacks within the envelope.
02
FAA-required obstruction lighting on smaller industrial stacks.
03
Above-water marine pilings, dock piles, and similar cylindrical foundations.
04
Smaller telecom monopoles, lighting structure poles, and similar structures.
05
Field documentation packages for your engineering team or licensed inspector.
06
External coating documentation for refinishing programs and capital planning.
01
No major-firm mobilization structure for a smaller documentation need.
02
Hospitals, universities, food processing, district heating, and small manufacturing.
03
Arcaed documents the field condition; your engineer produces the certified assessment.
04
If the asset is outside the envelope, Arcaed says so up front.
05
Aviation lighting, insurance-driven inspection, and smaller-stack documentation support.
06
Annual or semi-annual schedules can be priced predictably.
05
One-off inspection and documentation for specialty cylindrical structures such as smaller stacks, pilings, tanks, monopoles, monuments, and other vertical assets inside Arcaed working limits.
01
Arcaed inventories, maps, photographs, and reports on streetlights, flagpoles, palms, masts, and other vertical assets for municipalities, campuses, resorts, property managers, and industrial sites.
Typical first call
Identify a smaller industrial asset that needs documentation. Arcaed quotes it or tells you it is not the right fit.